Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114
Protea Hotel – MAR&MOR

MAR&MOR

Building Services Firm

Project Location

Completion Date

2018

The Challenge

Solutions We Provided

Bathroom Design & Modelliing

Electrical Engineering Solutions

Lighting

Fire Safety Solutions

Plumbing Solutions

Water Supply, Conveyance & Pipe Systems

Bathroom Design & Modelliing

Electrical Engineering Solutions

Lighting

Fire Safety Solutions

Plumbing Solutions

Water Supply, Conveyance & Pipe Systems

Nature of Project

About the Project

This Ultra-Modern hotel facility is a 19,000Sqm multi floor commercial hotel and hospitality building with over 72 standard rooms and 18 suites. Also, a standard swimming pool and world class industrial kitchen.

Project Gallery

Protea Hotel

Project Location

Project Completion

2018

The Challenge

Solutions We Provided

Bathroom Design & Modelliing

Electrical Engineering Solutions

Lighting

Fire Safety Solutions

Plumbing Solutions

Water Supply, Conveyance & Pipe Systems

Nature of Project

About the Project

This Ultra-Modern hotel facility is a 19,000Sqm multi floor commercial hotel and hospitality building with over 72 standard rooms and 18 suites. Also, a standard swimming pool and world class industrial kitchen.

Project Gallery

Shopping Basket