Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114
Central Office Park – MAR&MOR

MAR&MOR

Building Services Firm

Project Location

FCT-Abuja, Nigeria

Completion Date

2018

The Challenge

Solutions We Provided

Electrical Engineering Solutions

Lighting

Fire Safety Solutions

Medium/Low Voltage Systems

Electrical Engineering Solutions

Lighting

Fire Safety Solutions

Medium/Low Voltage Systems

Nature of Project

About the Project

Central Office Park is a 12,491m2, 4-floor mixed development with 7,178m2 of shopping space at the floor level and A-grade offices on the first, second and third floor.

Project Gallery

Central Office Park

Project Location

FCT-Abuja, Nigeria

Project Completion

2018

The Challenge

Solutions We Provided

Electrical Engineering Solutions

Lighting

Fire Safety Solutions

Medium/Low Voltage Systems

Nature of Project

About the Project

Central Office Park is a 12,491m2, 4-floor mixed development with 7,178m2 of shopping space at the floor level and A-grade offices on the first, second and third floor.