Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114
Abia Mall – MAR&MOR

MAR&MOR

Building Services Firm

Project Location

Completion Date

2017

The Challenge

Solutions We Provided

Bathroom Design & Modeling

Electrical Engineering Solutions

Lighting

HVAC Solutions

Fire Safety Solutions

Plumbing Solutions

Water Supply, Conveyance & Pipe Systems

Waste Systems and water reticulation systems

Medium/Low Voltage Systems

Bathroom Design & Modeling

Electrical Engineering Solutions

Lighting

HVAC Solutions

Fire Safety Solutions

Plumbing Solutions

Water Supply, Conveyance & Pipe Systems

Waste Systems and water reticulation systems

Medium/Low Voltage Systems

Nature of Project

About the Project

The mall is a 24,000Sqm multi-floor commercial building with over 68 shop/office spaces with anchor tenants like: Shoprite, PEP, and Kilimanjaro.

Project Gallery

Abia Mall

Project Location

Project Completion

2017

The Challenge

Solutions We Provided

Bathroom Design & Modeling

Electrical Engineering Solutions

Lighting

HVAC Solutions

Fire Safety Solutions

Plumbing Solutions

Water Supply, Conveyance & Pipe Systems

Waste Systems and water reticulation systems

Medium/Low Voltage Systems

Nature of Project

About the Project

The mall is a 24,000Sqm multi-floor commercial building with over 68 shop/office spaces with anchor tenants like: Shoprite, PEP, and Kilimanjaro.

Project Gallery

Shopping Basket